Today, the workers arrived about 8:00. Taylor even helped pack up all the cabinets and closets. The next step was to place the tarps down to protect our hardwood floors. The demolition of the shower began and it was a mess- the shower pan had been ripped during installation, therefore the shower had leaked all these years. Here are some pictures of the Master Bathroom project.
No comments:
Post a Comment