Demolition Begins
Today, the workers arrived about 8:00. Taylor even helped pack up all the cabinets and closets. The next step was to place the tarps down to protect our hardwood floors. The demolition of the shower began and it was a mess- the shower pan had been ripped during installation, therefore the shower had leaked all these years. Here are some pictures of the Master Bathroom project.
Sunday, January 20, 2019
Master Bathroom Remodel
We are starting our remodel of our bathroom tomorrow ( MLK) and the project will take about 4 weeks. Trey and I went to Lowe’s to shop for the last few items- toilet paper holder, towel rack, etc.
Before Pictures
Saturday, January 19, 2019
Griffin Scores 20 points
Today, Griffin’s team played at ECS. The crazy rims made for a big adjustment, but we hung in there. We were losing 7-4 at the beginning, but Griffin scored 4 quick points before the end of half to give us the lead 8-7. In the second half, our team went to zone and stopped ECS from scoring. Griffin went on to get an offensive rebound and dribble all the way for a jump shot and he got an open court steal for a lay-up. The game was fun because we ended up winning 26-11.
Great game, Griffin! #3
Thursday, January 17, 2019
Taylor Gets Braces
Today, Taylor headed to the Orthodontist at 1:30 for his top braces and appliance. The appliance will help to widen the room of his mouth. Here are some pictures of the day.