Friday, January 26, 2018

Day 4- Layed the Pool Floor

Here are some pictures of the pool guys laying down the Portland Sand for the bottom of the pool. The sand is like cement without the water. Basically the sand is pasted all over the bottom of the pool. It was fun watching this progress. Very interesting.


The  shallow end with the sand




Working with the sand on the deep end


Pouring more Portland Sand  into the deep end







Taylor  watching outside on Friday afternoon before his game










No comments:

Post a Comment